PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Resumed roofing installation at the High Roof Facing South.jpg Finished welding the steel angle extension at the South Elevation.jpg Installing copper piping at the 4th floor bathrooms Facing North.jpg Installing motorized dampers at the 4th floor Facing East.jpg Installing sheathing along the parapet at the West Elevation.jpg Installing control valves at the 1st floor VAV Boxes Facing South.jpg Installing the Centrifugal system at the 1st floor  Sprinkler Room Facing East.jpg
Previous pageNext page Installing copper piping at the 4th floor bathrooms Facing North
Installing copper piping at the 4th floor bathrooms Facing North